|
1.
Distances are measured.
|
|
|
|
|
|
|
2. Sod is
carefully removed.
|
|
|
|
|
3. Holes
are excavated.
|
|
|
|
|
|
|
4. The
initial hole is drilled
in the basement wall.
|
|
|
|
5. The
steel anchor rod
is inserted.
|
|
|
|
|
|
|
6. The
outside earth
anchor is attached.
|
|
|
|
7. A steel
wall plate
is installed and
tightened.
|
|
|
|
|
|
|
8. The
hole is
filled, and the
sod is replaced.
|
|
|
|